December 1997 - Liverpool Bridge
The three lane Liverpool bridged required urgent duplication due to the bottleneck caused with the tidal flow system during morning and afternoon peaks. The duplication resulted in seven lanes of freeway, four eastbound and three westbound.
Thanks to OZROADS for the information.