February 2017 - Additional Granville Viaduct
Widening of the Granville viaduct could not occur, so a new two lane elevated roadway westbound was opened. This roadway went left before the James Ruse Drive before joining Church Street. The old section remained open for traffic entering from James Ruse Drive only, while work commenced on the original viaduct.
Thanks to OZROADS for the information.